CN111395207A
|
|
Rapid dismantling device for bridge flexible cable structure and implementation method
|
CN111395206A
|
|
On-site deviation rectifying method for spherical support seat emptying
|
CN111337213A
|
|
Bridge modal frequency identification method and system based on synthetic power spectrum
|
CN111310307A
|
|
Correlation-based health monitoring data reference value setting method
|
CN111274544A
|
|
Early warning threshold setting method based on relevance trend of moving interval
|
CN111485488A
|
|
Plate type sliding layer support and construction method thereof
|
CN110952463A
|
|
Reverse jacking reinforcement method and jacking structure of concrete box girder bridge
|
CN110904864A
|
|
Steel-concrete combined system for improving bearing capacity of concrete box girder bridge
|
CN110470422A
|
|
A kind of fundamental frequency optimization method based on inhaul cable vibration spectrum analysis
|
CN110598265A
|
|
Bridge health data abnormity correction method and system based on wavelet analysis
|
CN110306609A
|
|
Bridge single pile anchored pile-testing method test pile system based on shoulder pole principle
|
CN110130233A
|
|
A kind of remodeling method suitable for double curvature arched bridge spandrel construction
|
CN110130232A
|
|
A kind of method of bridge pier overall stiffness enhancing and pile foundation reinforcement
|
CN109975811A
|
|
A kind of the bridge pier with highrise pile cap local scour on-line monitoring platform and method of suitable unimodal current
|
CN110130216A
|
|
A kind of overlapping connection structure of steel truss girder bridge and concrete carriageway plate
|
CN109826249A
|
|
A kind of measuring device and measuring method of pile foundation side friction
|
CN109797649A
|
|
A kind of tool car Hoisting Program not influencing bridge deck traffic
|
CN109992815A
|
|
A kind of support accumulative displacement calculation method based on relevance rain-flow counting
|
CN109376478A
|
|
Bridge health monitoring fault data restorative procedure and system
|
CN109610532A
|
|
The reinforced construction method of bridge foundation protection against erosion
|