CN112131648A
|
|
Surface settling tank correction method based on three-dimensional mirror image theory and exponential function
|
CN111980716A
|
|
Calculation method for predicting soil body settlement caused by asynchronous tunneling of parallel tunnels
|
CN111691899A
|
|
Construction method for excavating underpass bridge tunnel based on CRD (reverse tunneling diode) of full-face grouting
|
CN111594221A
|
|
Tunnel secondary lining full-section integrated construction trolley and secondary lining method using same
|
CN111455859A
|
|
Construction method for bracket of No. 0 and No. 1 steel bridge with high piers and continuous steel structure
|
CN111441800A
|
|
Karst cave filling device and filling method thereof
|
CN111371045A
|
|
Cable groove structure and installation process thereof
|
CN111293785A
|
|
Transformer substation power monitoring system
|
CN111445509A
|
|
TBM hob abrasion geometric dimension visual measurement method and system
|
CN111239367A
|
|
Automatic simulation experiment device and method for ground settlement
|
CN111122329A
|
|
Electric movable retaining wall test system
|
CN111189712A
|
|
Shield tunnel seam stress prototype test system
|
CN110016860A
|
|
A kind of hanging apparatus of double drag-line cable-stayed bridges
|
CN108565785A
|
|
Direct-buried cable laying method and the dedicated cable protecting sleeve of this method
|