CN103711495A
|
|
Support-free and partial-segment-free shield launching method for subsurface excavated tunnel
|
CN103726664A
|
|
Post-tensioning prestress hole cleaning and reeving device and method
|
CN104695983A
|
|
Method for welding embedded steel bar welding joints of two end nodes in initial supporting arch
|
CN104695877A
|
|
Large pipe shed construction method by using Luoyang shovel
|
CN103643973A
|
|
CRD construction method tunnel waterproof construction method
|
CN103645296A
|
|
Underground water detection method
|
CN103643964A
|
|
Excavation leakage-prevention supporting method for water-less sandy-soil stratum tunnel
|
CN104088665A
|
|
Steel pipe column construction process for underground excavated station
|
CN103628889A
|
|
Quick sealing method for excavating phyllite stratum tunnel
|
CN103628887A
|
|
Large-section water-rich saturated fine sand railway tunnel excavation method
|
CN103628916A
|
|
Excavation construction method of high-pressure water gushing tunnel
|
CN103628886A
|
|
Method for excavating weak surrounding rock tunnel under water-rich high-ground-stress conditions
|
CN103628915A
|
|
Dewatering and drainage method for large-section water-rich saturation fine-silt tunnel
|
CN103628888A
|
|
Stability augmentation and solidification method for large-section water-rich saturation fine-silt railway tunnel
|
CN103628890A
|
|
Soft phyllite tunnel excavation deformation control method
|
CN103556641A
|
|
Grooving assisting method for in-pit underground diaphragm wall of existing basement
|
CN103397892A
|
|
Shield starting tunnel portal extension steel ring
|
CN102808516A
|
|
Tensioning system
|
CN102787844A
|
|
Tunnel building method for heading pilot tunnel and inclined shaft on super long tunnel with small-diameter heading machine
|
CN102787845A
|
|
Segmented construction method of extra-long tunnels by adopting development machines to construct inclined shafts and headings first
|