CN112196266A
|
|
Split bolt assembly
|
CN112227502A
|
|
Drainage inspection well construction method
|
CN112025631A
|
|
Automatic wheel disc switching device of electric tool for vertical operation of aerial work arm
|
CN111828049A
|
|
Shallow-buried underground excavation tunnel advanced small guide pipe construction method
|
CN111828056A
|
|
Shallow-buried underground excavation tunnel waterproof construction method
|
CN111828048A
|
|
Method for preventing powder soil from collapsing at top of shallow-buried and underground-excavated tunnel construction hole
|
CN111828051A
|
|
Construction method of two-lining middle partition wall injection tunnel with support
|
CN111705812A
|
|
Recoverable assembly type foundation pit supporting construction method
|
CN111691586A
|
|
Construction method for spraying and building wall by using phosphogypsum
|
CN111749361A
|
|
Construction method of gypsum spraying wall
|
CN111576891A
|
|
Construction method of bolt-connected criss-cross H-shaped steel truss
|
CN111561050A
|
|
Ellipsoidal single-layer grid bulk construction method
|
CN111561148A
|
|
Reinforcing apparatus at dysmorphism corner in aluminum alloy template
|
CN111472284A
|
|
Assembling method for cantilever of prefabricated segmental beam portal crane of urban viaduct
|
CN111472553A
|
|
Thin-wall hollow pier intensive type reinforcement modular construction method
|
CN111323192A
|
|
Deep-buried pipeline vibration attenuation effect testing method based on dynamic compaction reinforcement
|
CN111454017A
|
|
Novel resin type artificial stone and preparation method thereof
|
CN111172872A
|
|
Maintenance car for repairing concrete guardrail of viaduct
|
CN111119071A
|
|
Construction method for assembling precast concrete segment box girder
|
CN111042001A
|
|
Temporary anchoring support-free construction method for prefabricated section beam closure section
|