Learn more

CHINA 22MCC GROUP TIANJIN CONSTRUCTION CO LTD

Overview
  • Total Patents
    16
  • GoodIP Patent Rank
    126,512
  • Filing trend
    ⇩ 25.0%
About

CHINA 22MCC GROUP TIANJIN CONSTRUCTION CO LTD has a total of 16 patent applications. It decreased the IP activity by 25.0%. Its first patent ever was published in 2013. It filed its patents most often in China. Its main competitors in its focus markets civil engineering, packaging and shipping and mechanical elements are PYNFORD LTD, MOYHER CHARLES S and Zhongli construction group co ltd.

Patent filings in countries

World map showing CHINA 22MCC GROUP TIANJIN CONSTRUCTION CO LTDs patent filings in countries
# Country Total Patents
#1 China 16

Patent filings per year

Chart showing CHINA 22MCC GROUP TIANJIN CONSTRUCTION CO LTDs patent filings per year from 1900 to 2020

Top inventors

# Name Total Patents
#1 Qu Jianhua 13
#2 Huang Xiuzhen 9
#3 Ma Jiye 8
#4 Xia Fei 5
#5 Sun Haibo 5
#6 Yao Dongsen 4
#7 Zhu Wen Ge 3
#8 Wang Bin 3
#9 Ren Weiyi 3
#10 Shen Dianqing 2

Latest patents

Publication Filing date Title
CN109505407A From stripping type aluminum alloy pattern plate inner membrance and its construction method
CN109372023A Inflatable airbag and construction method for the construction of raft board post poured band
CN109235910A Building wall mortar applicating machine
CN107939094A Conical concrete construction of funnel method
CN107489264A Shaped steel adds the high support system construction method of steel pipe scaffold
CN107587715A Aluminum alloy mould plate root processing method
CN107190989A Shaped steel partition plate external wall construction method
CN106594387A Pipe gallery group pipe transportation device
CN106505484A Piping lane cable laying method
CN106351259A Pipe gallery assembly type bridge frame installing method
CN106400837A Horizontal sliding and transporting method for pipelines in pipe corridor
CN106352158A Pipe gallery pipeline transporting and installing method
CN104328786A Construction method for cleaning soil in ultra-deep prestressed pipe pile core
CN103290840A Prestressed pipe pile construction method under boulder group geological conditions
CN103290838A Construction method capable of guaranteeing bearing capacity of pipe piles
CN103290845A Pipe pile head fixing method