CN112049122A
|
|
One-step forming construction method for deep foundation pit soft soil slope high-pressure rotary spraying prestressed anchor cable
|
CN112049236A
|
|
Construction method for hanging decoration construction platform under high-altitude large cantilever structure of high-rise building
|
CN112049270A
|
|
Construction method of steel structure workshop color plate and aluminum foil laminated shielding system
|
CN111364754A
|
|
Construction method of art wood grain veneer fair-faced concrete
|
CN111255132A
|
|
Unit type glass curtain wall construction method
|
CN110562868A
|
|
Hoisting construction method for unit type glass curtain wall of super high-rise building
|
CN110566029A
|
|
gradual installation and construction method for high-rise steel tower
|
CN110542502A
|
|
Bearing capacity experimental method for pull-up type overhanging scaffold without pull rod
|
CN110565839A
|
|
Construction method for tenon-and-mortise connection of self-insulation wall constructional column
|
CN110565946A
|
|
Construction method for supporting post-cast strip of basement of large-scale overhanging structure building
|
CN107964976A
|
|
Steel pipe-conversion steel platform tower crane top-down construction method
|
CN108035554A
|
|
The steel column supporting frame construction method of high-rise building frame column
|
CN108035548A
|
|
The closed template construction method of cast-in-place concrete stair
|
CN107989381A
|
|
Decorative board for wall is without cutting plug-in type construction method of installation
|
CN107965065A
|
|
Buckling support Combined type pre-embedded member construction method
|
CN106760707A
|
|
Trench abnormity branch mouthful embedded iron construction method
|
CN106499154A
|
|
Floated wood floor board for sports ground system and its construction method
|
CN105625732A
|
|
Supporting-free construction method of ultrahigh overhung steel-structure truss
|
CN105298145A
|
|
Vertical external sun-shading welding-free construction method of hidden-frame curtain wall
|
CN105442605A
|
|
Construction method for drawing out prestress high concrete (PHC) pile and reusing PHC pile for retaining in deep excavation
|