CN112252367A
|
|
Negative buoyancy immersed tube and prefabricating method thereof
|
CN112252366A
|
|
Design method of negative buoyancy immersed tube
|
CN112267703A
|
|
Reconstruction and extension construction method and structure for mixed structure old wharf
|
CN112197066A
|
|
Large-diameter overlong HDPE (high-density polyethylene) pipeline discharging and transporting construction method
|
CN112212074A
|
|
Large-diameter overlong HDPE pipeline closure method
|
CN112228632A
|
|
Land water delivery and entry method for large-diameter ultra-long HDPE (high-density polyethylene) pipeline
|
CN112112199A
|
|
Device for protecting bridge circuit for steel plate surface strain test and mounting method
|
CN112084565A
|
|
Method, device, equipment and medium for determining preferred compaction process of rockfill subgrade
|
CN111945657A
|
|
Wharf upgrading and reconstruction structure and wharf upgrading and reconstruction construction method
|
CN112081011A
|
|
Shipping and transporting method for large prestressed concrete precast box girder
|
CN112081012A
|
|
Jacking and transporting method for large prestressed concrete precast box girder
|
CN112030934A
|
|
Anti-liquefaction treatment method for liquefiable foundation
|
CN111941637A
|
|
Sectional prefabricating method for immersed tube joint
|
CN111997093A
|
|
Short pipe section immersed tunnel construction method
|
CN111937689A
|
|
Method for ecologically solidifying dredged soil by planting specific plants
|
CN111980067A
|
|
Construction method for long-distance conveying of immersed tube by adopting refuting process
|
CN111827032A
|
|
Processing method for determining structural thickness of pavement paved on hardened layer of beam field
|
CN111983622A
|
|
Visual measurement system and method for armor block
|
CN111877741A
|
|
Template for placing embedded steel bars and construction method thereof
|
CN111648406A
|
|
Construction method for dismantling immersed tube ballast system and replacing concrete
|