Collecting well connector for eternal drainage and this construction technique
KR20110032987A
Uplift pressure control system
KR100822004B1
Cone type foundation
KR100823602B1
Sump
KR100725068B1
Compound foundation method of construction using cast in place top base was formed connection groove and this
KR100748204B1
Cast in place and fabricated type top base set case and it's reinforced complex foundation method
KR100643638B1
Reverse placing pipe for top-down construction method was used mesh
KR20060072986A
Drain board connection plate
KR20050116959A
Top-shaped pile container cover having a through hole in the center and construction method of field-striked top foundation using the cover
KR20050099837A
Construction-sited striking type the top post foundation installed by connecting a number of top post unit panel and constructing method thereof
KR20050099876A
Manufacturing stand for fabrication frame of located reinforcing bar and manufacturing method for mat-type fabrication frame of located reinforcing bar using the manufacturing stand
KR20050029332A
Basic bottom permanent drainage structure using trench and drainage member and it's construction method
KR20050027286A
Drain board for construction work, and it's manufacture method
KR20050013456A
chamber for uplift reduction processing, and it's construction method
KR20040070574A
Relief point structure and its installation method for treatment of up-lifting water pressure affecting underground structure
KR100309316B1
The method for double flood control of a culvert with box construction formular