CN110965595A
|
|
Raft foundation building lifting reinforcement structure and method under corrosive geological environment
|
CN112081127A
|
|
Tunnel earth surface pre-grouting reinforcement method
|
CN112081156A
|
|
Grouting reinforcement lifting method for frame structure building
|
CN112081159A
|
|
Method for reinforcing settlement of independent foundation of building brewing workshop
|
CN112081158A
|
|
Construction process for forming reinforced composite pile foundation by advanced grouting of high-rise building
|
CN112081154A
|
|
Method for reinforcing and lifting high-rise building with raft foundation
|
CN112081153A
|
|
Lifting method of raft foundation high-rise building
|
CN112081155A
|
|
Reinforcing and lifting method for bar-shaped or box-shaped foundation building
|
CN112081157A
|
|
Construction process for forming reinforced composite pile foundation by high-rise building retreating type grouting
|
CN111470837A
|
|
Collapsible loess composite grouting material and preparation method and application thereof
|
CN110241663A
|
|
Correcting and then reinforcing method while high-speed railway subgrade lateral displacement and sedimentation
|
CN110241662A
|
|
A kind of high-speed railway subgrade differential settlement reinforcing lifting leveling method
|