Filling material for the gap between a probe and the surrounding earth in a bore hole, comprises mineral clay, a binding agent, powder or granulate, and water
DE10049230A1
Use of graphite screed for underfloor heating
DE10002827A1
Process for producing a pumpable sealing wall concentrate and its uses
DE19752600A1
Rotary kiln production of Portland and blast furnace cements
DE19738056A1
Denitrifying of kiln exhaust gases
DE19501074A1
Process for controlling the hardening process of expansion cements, expansion cement and its use
DE4205354A1
Dry mix for the production of hydromechanically conveyable building material suspensions and their use
EP0262302A2
Sealing mass for walls, dry mixture and process for preparing it
DE3633736A1
Wall-jointing compound, dry mixture and process for producing them
DE3610755A1
SEALING WALL, DRY BLEND AND METHOD FOR THEIR PRODUCTION
DE3303008A1
INORGANIC BINDERS FOR THE PRODUCTION OF GAS CONCRETE STONES
DE2650045A1
Filling mining cavities - using dil. aq. hydraulic binder or mortar suspension admixed with compsn. contg. solidification accelerator and thixotropic component
DE2625067A1
Filling up underground cavities remaining after mining - with compsn. contg. deacidified marl, portland cement and gypsum
IE41376L
High initial strength cements
DE2431613A1
GAS CONCRETE BLEND
DE2427222A1
PROCESS FOR THE PRODUCTION OF STANDARD CEMENTS OF HIGH INITIAL STRENGTH