Learn more

3RD CONSTR CO LTD OF CHINA CONSTR 8TH ENG BUREAU

Overview
  • Total Patents
    37
  • GoodIP Patent Rank
    41,792
  • Filing trend
    ⇩ 100.0%
About

3RD CONSTR CO LTD OF CHINA CONSTR 8TH ENG BUREAU has a total of 37 patent applications. It decreased the IP activity by 100.0%. Its first patent ever was published in 2016. It filed its patents most often in China. Its main competitors in its focus markets civil engineering, measurement and agriculture are MCC TIANGONG GROUP CORP LTD, CHINA METALLURGICAL CONSTRUCTION ENG GROUP CO LTD and 3RD CONSTR CO LTD CHINA CONSTR 8TH ENG DIVISION.

Patent filings in countries

World map showing 3RD CONSTR CO LTD OF CHINA CONSTR 8TH ENG BUREAUs patent filings in countries
# Country Total Patents
#1 China 37

Patent filings per year

Chart showing 3RD CONSTR CO LTD OF CHINA CONSTR 8TH ENG BUREAUs patent filings per year from 1900 to 2020

Focus industries

Top inventors

# Name Total Patents
#1 Quan Youwei 34
#2 Shen Xingdong 16
#3 Cheng Jianjun 9
#4 Wang Peng 5
#5 Liu Yasong 5
#6 Li Shuxin 4
#7 Qiao Jingbin 3
#8 Xu Xu 3
#9 Huang Feng 3
#10 Fu Xiaoduo 3

Latest patents

Publication Filing date Title
CN107524152A A kind of foundation pit enclosure structure stress bringing device and its construction method
CN107605107A A kind of method for controlling pitched roof concrete construction quality
CN107503297A Basket protection maintenance canopy integrated with beam body steam curing and its construction method
CN107503512A A kind of special-shaped clear water concrete post hybrid template reinforcement system and its lossless form removal method
CN107524091A The constructing device and its construction method of erection of precast beams are carried out on existing road
CN107620449A A kind of face of cylinder annular floating screed instrument and face of cylinder plastering method
CN107503342A A kind of diaphram wall and its construction method
CN107476314A A kind of deep basal pit bed course adds axle power construction method
CN107299596A Support beam template system and its construction method under concrete support trestle plate
CN107503454A Super large width bend glass curtain wall mechanization installation method
CN107214843A One kind is exempted to cut pile crown type precast square pile constructing device and its construction method
CN107100286A A kind of clear-water concrete bolt hole closure and external corner method for repairing and constructing
CN107035150A Pedal for quadric-plastering before floor concrete final set
CN107023214A Can turnover type Fast Installation hoarding
CN107061865A A kind of new and old pipeline of sewage treatment plant's heavy caliber does not stop production the method for meeting and discussing
CN107100377A The bolt hole closure fix tool and plugging repair method of a kind of clear-water concrete
CN107012994A A kind of multilayer roof drainage system is with unpowered from device against overflow of water
CN106988509A A kind of wall plastering thickness controls device surely
CN106958297A A kind of outer wall of basement hole to be provided temporary blocking device and method for blocking
CN107060779A A kind of anti-cut construction method of narrow regions ultra-deep passage inclined shaft